View Single Post
  #12  
Old 11th November 2012, 06:32 AM
demodocus demodocus is offline
Member
 
Join Date: Apr 2010
Posts: 59
Default System Testing

A method I've used with some success is to take my d/b (14 yrs), split it in 2 parts, develop the idea on one lump and then run test the produced system on the other. That avoids testing a system on the data that was used to develop it.
Reply With Quote